The new hall is being built within a short timeframe since construction began. In contrast to the original building, which was founded on pad foundations with welded consoles, the new structure uses deep foundations that meet current standards.

The building will be equipped with a green roof, a green façade, and a photovoltaic power plant with a capacity of 52 kWp. The design places great emphasis on maximising the use of daylight in the interior — for us, a production hall is first and foremost a working environment where people spend a substantial part of their day, and it is important to us that everyone feels comfortable here.
During the demolition of the original hall, we reused all materials that could be reused — and those that could not be used were responsibly and ecologically recycled.

More than thirty years after the construction of the original hall, we are demonstrating what responsible industrial construction in the 21st century can look like. The new hall represents another step in the development of the LIKO-S Industry division, and we look forward to seeing it completed.
Interested in our solutions? Looking for a quote, or just want to ask something? Do not hesitate to contact us!